TLBakken

From SHA2017
Jump to: navigation, search
TLBakken
Photo 2017-06-23 20-36-30.jpg
Person Responsible User:SA007
Status ready
Budget Required 300
Budget Granted 300
buildup from 08-02
buildup duration 1 day
buildup orga 0
buildup angels 2
teardown from 08-09
teardown duration 6 hours
teardown orga 0
teardown angels 4
waste 0
comments Needs to be returned to hack42.

Colored TL-lights.

There are in total about 200 of these things. 100 are intended for IN tents (can be white, but is not as much fun). The other 100 are for "around the field".

About 20 extension cables have been arranged at the power team. 20 power bricks have been arranged at the shopping team.

orga tents

100 TL's should be distributed to all orga tents

  • Stage Pa: 4 (av team)
  • Stage No: 4 (av team)
  • Stage Re: 2 (av team)
  • Bar: 4 (bar team)
  • Lounge: 2 (lounge team)
  • Silent lounge: 2 (silent lounge team)
  • Radio studio: 4
  • Speakerdesk: 2
  • infodesk front end: 4
  • Kitchen: 2
  • Angel area: 4
  • AV tent: 2
  • NOC tent: 2
  • Tickets & Entrance: 4
  • Parking: 4
  • Harbour: 8
  • Deco tent: 2
  • POC tent: 2
  • Porto cabins: 2
  • Logistics warehouse: 2
  • First aid: 2 (white)
  • merchandise: 2
  • Stewards: 2
  • Security :2
  • CTF: 2
  • Workshop pi: 4
  • Workshop tau: 4
  • Lasersea tower: 8
  • "arcade" bar: 8
  • Family village 1: 3
  • Family village 2: 3
  • Toilet buildings, where needed; 10

Any others on request.

Terrain

DO check if they are water tight. If not, add transparent tape, this is supplied.

Next to each power box, we can deploy four of them. For this you need an extension cable (see power above) and a power brick (see above). All power stuff has to be wrapped in a garbage bag so it's water tight. Then deployed in a cross form in the range of the power cable.

Like this:

            |
            |
       ----- -----
            |
            |

Dependencies

  • TODO: Other teams needed?
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

  • TODO: Buildlog...

Howto: Buildup

  • TODO: Where to get the stuff from?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?