Meeting Communications 20161117 Bi-Weekly Mumble
From SHA2017
meeting minutes
"->" means "responsible for"
teams -> channels channels -> topics If something with wrong topic arrives in a channel -> move it to approprite channel
talk to building: we want a press tent. Our requirements.
We should think about the events we need to generate attention for:
- post-Congress and submission deadline
- ticket sales start and end
- alternative power grid (maybe 4 months before the event?)
- the event itself
- other events: talk to the teams what other turning points there are
We need to talk about how other teams can request stuff from us. "please make noise" is not going to work. We need something to work with and need to figure out timing
zeno takes care of blog accounts
We have the press@ and news@ as possible blog post