|Does=Provide power to all of the event | |Does=Provide power to all of the event | ||
|Exclusive team=Yes | |Exclusive team=Yes | ||
+ | |Contact=power@lists.sha2017.org | ||
+ | |IRC=sha2017-power | ||
|Vacancies=8 | |Vacancies=8 | ||
|Projectleiding=User:Attilla | |Projectleiding=User:Attilla | ||
+ | |Backup_Projectleiding=User:Rolfvandekrol | ||
}} | }} | ||
==About== | ==About== | ||
− | Providing power to the event | + | Providing power to the event. We expect to have the equipment running from the 29th of July to the 10th of August. Power distribution to the camping fields may be built up later and broken down earlier, but it will be running from the 4th to the 8th of August at least. |
+ | |||
+ | |||
+ | Team:Power will try to put distribution boxes within 25m of every camping spot, except for two areas. Engelbart field and Zuse field will have very limited to no power at all. The distribution boxes have got many Schuko and 400V/32A CEE sockets, but be kind and share with your neighbors. If villages need 400V/32A full load, it's best they contact us by mail, as it might not be available at end of long chains, far away from the generator. | ||
+ | |||
+ | |||
+ | For orga/track tents and buildings, we will provide power cables within the structures as well. | ||
+ | |||
+ | |||
+ | ==Members== | ||
+ | {{TeamMemberList}} | ||
+ | * [[User:Roosted|Roosted]] | ||
+ | |||
+ | ==ToDo== | ||
+ | * Fill out [[Team:Volunteers/Angeltypes]] before march 31 2017 | ||
+ | * Write a short text for the [https://wiki.sha2017.org/w/Facilities facilities page] on visitors wiki (will be used for booklet) | ||
+ | |||
+ | ==Requirements from other teams== | ||
+ | * [[team:Logistics/Waste]]: two times 3phase power (32A each) from event-1 until the end of teardown for trashcompactors (one behind foodcourt, other near logistics, but location and exact requirements are tbd). | ||
== Fixed Infrastructure == | == Fixed Infrastructure == | ||
− | There is a fixed Infrastructure on entire camp ground with an | + | There is a fixed Infrastructure on entire camp ground with an 60 Amp feed from the Power Company. This is partly used by terrain infra like lights, sewer pumps, etc. It's available for early buildup, basically until the generators are installed. After that, we'd like to move as much buildup stuff as possible to the generators. After the generators have been picked up again, it's available for teardown. A trash compactor will then probably be emptied and moved close to one of the buildings. |
[[File:Maincable.jpg|frameless|border|link=]] Fixed Power cable routing | [[File:Maincable.jpg|frameless|border|link=]] Fixed Power cable routing | ||
* From the Power station building running power cable to fields (Telephony and fieber too). | * From the Power station building running power cable to fields (Telephony and fieber too). | ||
− | |||
[[File:Fieldbox.jpg|frameless|border|link=]] Typically Fiele boxes | [[File:Fieldbox.jpg|frameless|border|link=]] Typically Fiele boxes | ||
Line 28: | Line 48: | ||
[[File:Mainswitch3.jpg|frameless|border|link=]] | [[File:Mainswitch3.jpg|frameless|border|link=]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 13:24, 14 May 2017
Power | |
---|---|
1st line contacts: | timo |
Does: | Provide power to all of the event |
Does not: | |
Is an exclusive team: | Yes |
Contact: | power@lists.sha2017.org |
IRC: | #sha2017-power |
Deadlines: | |
Needed resources: | |
Comment: | |
Vacancies: | 8 |
Current team size / amount of ppl: | 0 |
Contact at projectleiding: | User:Attilla |
Backup Contact at projectleiding: | User:Rolfvandekrol |
Managed Vacancies: | You can add for your team on a page by adding: {{TeamVacancies|Power}} |
About
Providing power to the event. We expect to have the equipment running from the 29th of July to the 10th of August. Power distribution to the camping fields may be built up later and broken down earlier, but it will be running from the 4th to the 8th of August at least.
Team:Power will try to put distribution boxes within 25m of every camping spot, except for two areas. Engelbart field and Zuse field will have very limited to no power at all. The distribution boxes have got many Schuko and 400V/32A CEE sockets, but be kind and share with your neighbors. If villages need 400V/32A full load, it's best they contact us by mail, as it might not be available at end of long chains, far away from the generator.
For orga/track tents and buildings, we will provide power cables within the structures as well.
Members
- Benadski
Nickname: Benadski
Team: Team:Power
Role: Powercycler
HackerSpace: RevSpace
Village: Village:tbd
- Crnf
Nickname: Crnf
Team: Team:Power
HackerSpace: warpzone
Village: Village:village:warpzone
Dect: 2340 - Dalsmo
Nickname: Dalsmo
Team: Team:Power
HackerSpace: mikrofabriken.se
- Edkikkert
Nickname: Edkikkert
Team: Team:Power
HackerSpace: FabLab Zeeland
- Hans
Nickname: Hans
Team: Team:Power
Role: Expert 125 A cable pulling
HackerSpace: MakerSpace Leiden
- RFguy
Nickname: RFguy
Team: Team:Power
HackerSpace: muCCC
Village: Village:muCCC
Dect: 2767 - Roosted
ToDo
- Fill out Team:Volunteers/Angeltypes before march 31 2017
- Write a short text for the facilities page on visitors wiki (will be used for booklet)
Requirements from other teams
- team:Logistics/Waste: two times 3phase power (32A each) from event-1 until the end of teardown for trashcompactors (one behind foodcourt, other near logistics, but location and exact requirements are tbd).
Fixed Infrastructure
There is a fixed Infrastructure on entire camp ground with an 60 Amp feed from the Power Company. This is partly used by terrain infra like lights, sewer pumps, etc. It's available for early buildup, basically until the generators are installed. After that, we'd like to move as much buildup stuff as possible to the generators. After the generators have been picked up again, it's available for teardown. A trash compactor will then probably be emptied and moved close to one of the buildings.
Fixed Power cable routing
- From the Power station building running power cable to fields (Telephony and fieber too).
Typically Fiele boxes
- The entire Field Grid kan be switched to a Portable Generator Port (2 single Wire Inputs)
- Main switch Panel