Difference between revisions of "Team:Productiehuis"

From SHA2017
Jump to: navigation, search
(add exclusivity)
Line 30: Line 30:
 
{{TeamMemberList}}
 
{{TeamMemberList}}
  
 +
== Relations to other teams ==
 +
{| class="wikitable"
 +
!Team
 +
!Relation
 +
 +
|-
 +
|[[Buildup Mgmt]] and [[Team:Volunteers]]
 +
|Setup and test
 +
 +
|-
 +
|[[Team:Volunteers]]
 +
|People operating the gear during the event.
 +
 +
|-
 +
|[[Team:Volunteers]]
 +
|Teardown
 +
 +
|-
 +
|[[Content]]
 +
|To anticipate special requests, Productiehuis *MUST* be kept in the loop to facilitate special interfaces, camera's and more.
 +
 +
|-
 +
|[[Team:Broadcast]]
 +
|To anticipate special requests, Productiehuis *MUST* be kept in the loop to facilitate special interfaces, camera's and more.
 +
 +
|-
 +
|[[Team:Infrastructure]]
 +
|Productiehuis will have special power requirements for the lighting, AV, streaming and radio.
 +
 +
|-
 +
|[[Team:Logistics]]
 +
|Productiehuis gear will need to be stored, pre-serviced before transport to the terrain, stored safely, moved and returned.
 +
 +
|-
 +
|[[Team:NOC]]
 +
|Modern audio and lighting equipment might need a private network, streamers need dedicated bandwidth from tents to the VOC to monitoring each tent equipment health (private/closed network). The streams must also be delivered to a content delivery network to stream online.
 +
 +
|}
 +
 +
[[Team:Volunteers]] Terrain: tenten
 +
NOC: accesspoints on truss/rigging
 +
LOC: do we do the lighting inside the tents?
 +
Broadcast: do we have overlap here?
 +
POC: will they be there?
 
== Todo ==
 
== Todo ==
 
There is a wiki page with a [[{{PAGENAME}}/Todo|todo list]].
 
There is a wiki page with a [[{{PAGENAME}}/Todo|todo list]].

Revision as of 20:03, 18 April 2016

Productiehuis
1st line contacts: geekabit
Does: Stage:
  • stage lights
  • projectors
  • video (equipment and streams)
  • audio stage
  • desks on stage

Radio:

  • equipment radio station
Does not: Stage:
  • the stage itself (the physical thing)
  • stage decoration (plants, etc.)

Radio:

  • radio content
  • radio license
Is an exclusive team: Yes
Contact: orga-av@lists.sha2017.org
IRC: #sha2017-productiehuis
Deadlines:
  • 2017/02/01 - point of no return (order list)
Needed resources:
Comment: Made up of voc, a/v, stage
Vacancies: 0
Current team size / amount of ppl: 0
Contact at projectleiding:
Backup Contact at projectleiding: {{{Backup_Projectleiding}}}
"{{{Backup_Projectleiding}}}" cannot be used as a page name in this wiki.
Managed Vacancies:
You can add for your team on a page by adding: {{TeamVacancies|Productiehuis}}

17 Team Members Productiehuis

team:avid during OHM2013

Team members

Relations to other teams

Team Relation
Buildup Mgmt and Team:Volunteers Setup and test
Team:Volunteers People operating the gear during the event.
Team:Volunteers Teardown
Content To anticipate special requests, Productiehuis *MUST* be kept in the loop to facilitate special interfaces, camera's and more.
Team:Broadcast To anticipate special requests, Productiehuis *MUST* be kept in the loop to facilitate special interfaces, camera's and more.
Team:Infrastructure Productiehuis will have special power requirements for the lighting, AV, streaming and radio.
Team:Logistics Productiehuis gear will need to be stored, pre-serviced before transport to the terrain, stored safely, moved and returned.
Team:NOC Modern audio and lighting equipment might need a private network, streamers need dedicated bandwidth from tents to the VOC to monitoring each tent equipment health (private/closed network). The streams must also be delivered to a content delivery network to stream online.

Team:Volunteers Terrain: tenten NOC: accesspoints on truss/rigging LOC: do we do the lighting inside the tents? Broadcast: do we have overlap here? POC: will they be there?

Todo

There is a wiki page with a todo list.

Meetings

All meetings (so far) are held via mumble No meetings planned. Look at the PastMeetings page, or link-3DForm:Team Meeting add a meeting here.