Difference between revisions of "Team:Decoratie"
Line 4: | Line 4: | ||
* Street names / signs | * Street names / signs | ||
* Main gate (+lights) | * Main gate (+lights) | ||
+ | * The design language and visual style of the event | ||
* Large-ish decor pieces throughout the terrain | * Large-ish decor pieces throughout the terrain | ||
* Art-net infra + operation center | * Art-net infra + operation center | ||
Line 10: | Line 11: | ||
* Build the analog decoration at Fabrication (preferably before the event starts) | * Build the analog decoration at Fabrication (preferably before the event starts) | ||
* Decorates the tents (NOT the stages) | * Decorates the tents (NOT the stages) | ||
− | |Does not=* Literal streetlights | + | |Does not=* Literal streetlights (i.e. we make roads visible, but don't guarantee that you won't stumble) |
− | * | + | * Building/lighting on stage, but we can provide decoration for items on stage/background if you ask nicely |
* The Lounge | * The Lounge | ||
* The physical infrastructure of our network (that's the responsibility of Team Infra) | * The physical infrastructure of our network (that's the responsibility of Team Infra) | ||
Line 18: | Line 19: | ||
* Lighting/decoration support brought by individual visitors | * Lighting/decoration support brought by individual visitors | ||
* Planning the partitioning of the terrain in areas and roads | * Planning the partitioning of the terrain in areas and roads | ||
+ | * Bar and horeca lighting | ||
+ | * Transportation of pre-fab decoration from build location to camp location | ||
+ | |Exclusive team=No | ||
|Contact=deco@lists.sha2017.org | |Contact=deco@lists.sha2017.org | ||
|IRC=sha2017-deco | |IRC=sha2017-deco | ||
|Deadlines= | |Deadlines= | ||
+ | |Vacancies=yes | ||
}} | }} | ||
== Team Decoration (DECO, previously LOC) == | == Team Decoration (DECO, previously LOC) == | ||
Line 42: | Line 47: | ||
Ideas (add ideas you want to incorporate): | Ideas (add ideas you want to incorporate): | ||
− | |||
− | |||
− | |||
− | Design | + | === Projects === |
− | * Blocks/Cubes as a basis | + | * The Design Language |
+ | ** Blocks/Cubes as a basis | ||
** SHA is an important protocol for block chains | ** SHA is an important protocol for block chains | ||
− | ** the | + | |
− | ** | + | ** Non-hitech to avoid alienating non-techy visitors |
− | ** | + | ** Needs to be colorfull |
+ | ** Welcoming | ||
+ | ** Subtle | ||
+ | ** If people are depicted in the design, minority groups should have priority | ||
+ | |||
+ | * Signs | ||
+ | ** Reuse the OHM production technique. Lasercut letter stamps. | ||
+ | ** Signs that we should make (and make visible): | ||
+ | *** Toilet | ||
+ | *** Street signs ko | ||
+ | *** Emergency exits | ||
+ | *** First aid | ||
+ | *** The entrance from the parking (also parking sigs) | ||
+ | *** signs from the highway to to camp (preferably many) (auto-reflecting (or illuminated)!) | ||
+ | |||
+ | * Entrance gate: | ||
+ | ** Scouting has offered to help construction of wooden things | ||
+ | ** Music? | ||
+ | ** Lights? | ||
+ | ** Flags? | ||
+ | ** Tunnel experience? (Like CC Congres) | ||
+ | |||
+ | * Functional lighting | ||
+ | ** Lights to see how the streets are (e.g. sleeves at ohm, tl's at ccc) | ||
+ | ** Floodlights | ||
+ | ** Lighting of tents from the outside, gates, trees, other structures | ||
+ | ** The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights. | ||
+ | |||
+ | * Decorative lighting | ||
+ | ** Reuse the OHM2013 LED poles. | ||
+ | *** Needs to be brighter to be functional (or jus place more) | ||
+ | *** Needs to be blockier | ||
+ | ** Big items such as the bar at ohm, or the big OHM2013 sign. | ||
+ | *** A giant LEDCube. | ||
+ | ** Roughly 10 items spread thoughout the camp. | ||
+ | |||
+ | * Other | ||
+ | ** A LEDCube (fits the theme) | ||
+ | ** Make blocks that fit on shackles making literal blockclains | ||
+ | ** Infotent decoration | ||
+ | |||
+ | === TODO === | ||
+ | * Recruit more members: everyone | ||
+ | * Draft and manage design competition: polyfloyd | ||
+ | |||
== Sub-team Fabrication == | == Sub-team Fabrication == | ||
+ | The factory will produce decoration pieces before the event and provide support during the event. | ||
+ | |||
+ | During the event it will be located on the event terrain as a two 5x5 meter | ||
+ | tents divided by a wall for messy and clean work. Available equipment are a few | ||
+ | crates of standard handtools, tables and chairs, and the FabLab Truck. | ||
+ | |||
+ | There will be no heavy machinery because it would require too much time during the short buildup. | ||
+ | |||
Leads: | Leads: | ||
* fk (mail@folkert-kevelam.nl) | * fk (mail@folkert-kevelam.nl) | ||
Line 61: | Line 116: | ||
* Off-site (beforehand) fabrication of electronics and signing, etc. | * Off-site (beforehand) fabrication of electronics and signing, etc. | ||
* On-site (at the event) fabrication of spare-parts and repairs. | * On-site (at the event) fabrication of spare-parts and repairs. | ||
+ | |||
+ | === TODO === | ||
+ | * Inform at Hack42 about storage/workspace, or something near Zeewolde: SA007 en moem | ||
+ | ** Alternatives: Nearby hangar, big shed, vrijland (Hack42) barack, garagebox or somewhere near a farmer | ||
+ | * Get a quote on the FabLab truck, crew and material for buildup (4 days) and camp: themba | ||
+ | * Recruit more members: everyone | ||
Line 73: | Line 134: | ||
* We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain. | * We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain. | ||
* We need the Volunteer-Team for volunteers to help create the decoration pieces. | * We need the Volunteer-Team for volunteers to help create the decoration pieces. | ||
+ | |||
+ | Teams that are dependent on the design: | ||
+ | * Badge | ||
+ | * Communication | ||
+ | * Helpdesk | ||
+ | * Online presense | ||
+ | |||
+ | == Budget == | ||
+ | {| class="wikitable" | ||
+ | ! colspan="3" | Budget | ||
+ | |- | ||
+ | | 1 || Constructions via scouting || ??? | ||
+ | |- | ||
+ | | 2 || Lights via 'blinkenlights', would cut lighting expenses by 10-15K || 0 | ||
+ | |- | ||
+ | | 3 || Datenklo/gate decoration || 5K | ||
+ | |- | ||
+ | | 4 || Wood for construction || 2K | ||
+ | |- | ||
+ | | 5 || Rent of temporary storage near the venue to reduce strain on logistics || 1K | ||
+ | |- | ||
+ | | 6 || Decoration and lighting || 45K | ||
+ | |- | ||
+ | | 7 || FabLab Truck || ??? | ||
+ | |- | ||
+ | | 8 || Tool rent || 2K | ||
+ | |} | ||
+ | |||
+ | === Usage Over Time === | ||
Line 78: | Line 168: | ||
Floating members: Themba (Randomdata) | Floating members: Themba (Randomdata) | ||
− | + | We need more people! Specificaly: | |
− | + | * Electronics guys | |
− | * | + | * Designers |
− | * | + | * Orga (but not too much) |
− | * | + | * Random helpers |
+ | |||
+ | Next meeting: April 30th (SHA orga meeting) | ||
+ | Agenda: | ||
+ | * ... |
Revision as of 13:18, 8 March 2016
Decoratie | |
---|---|
1st line contacts: | SA007, polyfloyd, Fk, Moem |
Does: |
|
Does not: |
|
Is an exclusive team: | No |
Contact: | deco@lists.sha2017.org |
IRC: | #sha2017-deco |
Deadlines: | |
Needed resources: | |
Comment: | |
Vacancies: | yes "yes" is not a number.
|
Current team size / amount of ppl: | 0 |
Contact at projectleiding: | |
Backup Contact at projectleiding: | {{{Backup_Projectleiding}}} "{{{Backup_Projectleiding}}}" cannot be used as a page name in this wiki.
|
Managed Vacancies: | You can add for your team on a page by adding: {{TeamVacancies|Decoratie}} |
Contents
Team Decoration (DECO, previously LOC)
Hi! We are the DECO team; responsible for the appeal of the SHA2017 venue. We will be creating fantastic looking decoration pieces and awe-inspiring lighting. We are split up in two sub-teams with each two people as team-leads:
Sub-team Design
The design sub-team will handle the decoration of the terrain as well as the lighting.
Leads:
- polyfloyd (floyd@polyfloyd.net)
- Moem
Tasks:
- Analog decoration (signs, billboards)
- Lights (practical, nice-looking, hackable)
Immediate TODOs:
- Think of ideas to execute.
Ideas (add ideas you want to incorporate):
Projects
- The Design Language
- Blocks/Cubes as a basis
- SHA is an important protocol for block chains
- Non-hitech to avoid alienating non-techy visitors
- Needs to be colorfull
- Welcoming
- Subtle
- If people are depicted in the design, minority groups should have priority
- Signs
- Reuse the OHM production technique. Lasercut letter stamps.
- Signs that we should make (and make visible):
- Toilet
- Street signs ko
- Emergency exits
- First aid
- The entrance from the parking (also parking sigs)
- signs from the highway to to camp (preferably many) (auto-reflecting (or illuminated)!)
- Entrance gate:
- Scouting has offered to help construction of wooden things
- Music?
- Lights?
- Flags?
- Tunnel experience? (Like CC Congres)
- Functional lighting
- Lights to see how the streets are (e.g. sleeves at ohm, tl's at ccc)
- Floodlights
- Lighting of tents from the outside, gates, trees, other structures
- The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights.
- Decorative lighting
- Reuse the OHM2013 LED poles.
- Needs to be brighter to be functional (or jus place more)
- Needs to be blockier
- Big items such as the bar at ohm, or the big OHM2013 sign.
- A giant LEDCube.
- Roughly 10 items spread thoughout the camp.
- Reuse the OHM2013 LED poles.
- Other
- A LEDCube (fits the theme)
- Make blocks that fit on shackles making literal blockclains
- Infotent decoration
TODO
- Recruit more members: everyone
- Draft and manage design competition: polyfloyd
Sub-team Fabrication
The factory will produce decoration pieces before the event and provide support during the event.
During the event it will be located on the event terrain as a two 5x5 meter tents divided by a wall for messy and clean work. Available equipment are a few crates of standard handtools, tables and chairs, and the FabLab Truck.
There will be no heavy machinery because it would require too much time during the short buildup.
Leads:
- fk (mail@folkert-kevelam.nl)
- SA007
Tasks:
- Off-site (beforehand) fabrication of electronics and signing, etc.
- On-site (at the event) fabrication of spare-parts and repairs.
TODO
- Inform at Hack42 about storage/workspace, or something near Zeewolde: SA007 en moem
- Alternatives: Nearby hangar, big shed, vrijland (Hack42) barack, garagebox or somewhere near a farmer
- Get a quote on the FabLab truck, crew and material for buildup (4 days) and camp: themba
- Recruit more members: everyone
Cooperation with other Teams
What teams depend on Decoration?
- The Communications-Team needs us for static communication (via signs) with the visitors.
Who do we depend on?
- We need the Logistics and Buildup teams to move pre-built decoration pieces to the venue during the buildup.
- We need the Power-Team to power our lights.
- We need the NOC-Team to be able to control our interactive lights.
- We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain.
- We need the Volunteer-Team for volunteers to help create the decoration pieces.
Teams that are dependent on the design:
- Badge
- Communication
- Helpdesk
- Online presense
Budget
Budget | ||
---|---|---|
1 | Constructions via scouting | ??? |
2 | Lights via 'blinkenlights', would cut lighting expenses by 10-15K | 0 |
3 | Datenklo/gate decoration | 5K |
4 | Wood for construction | 2K |
5 | Rent of temporary storage near the venue to reduce strain on logistics | 1K |
6 | Decoration and lighting | 45K |
7 | FabLab Truck | ??? |
8 | Tool rent | 2K |
Usage Over Time
Other
Floating members: Themba (Randomdata)
We need more people! Specificaly:
- Electronics guys
- Designers
- Orga (but not too much)
- Random helpers
Next meeting: April 30th (SHA orga meeting) Agenda:
- ...