Difference between revisions of "Team:Decoratie"
From SHA2017
(→Sub-team Design) |
|||
Line 46: | Line 46: | ||
* Reuse the OHM2013 LED poles. | * Reuse the OHM2013 LED poles. | ||
+ | Design ideas: | ||
+ | * Blocks/Cubes as a basis | ||
+ | ** SHA is an important protocol for block chains | ||
+ | ** the LEDCube idea is also a cube | ||
+ | ** 3d print blocks that fit on shackles making literal blockclains | ||
+ | ** Cube deco/lights are easy to make | ||
== Sub-team Fabrication == | == Sub-team Fabrication == |
Revision as of 19:44, 8 February 2016
Decoratie | |
---|---|
1st line contacts: | SA007, polyfloyd, Fk, Moem |
Does: |
|
Does not: |
|
Is an exclusive team: | |
Contact: | deco@sha2017.org |
IRC: | #sha2017-deco |
Deadlines: | |
Needed resources: | |
Comment: | |
Vacancies: | 0 |
Current team size / amount of ppl: | 0 |
Contact at projectleiding: | |
Backup Contact at projectleiding: | {{{Backup_Projectleiding}}} "{{{Backup_Projectleiding}}}" cannot be used as a page name in this wiki.
|
Managed Vacancies: | You can add for your team on a page by adding: {{TeamVacancies|Decoratie}} |
Contents
Team Decoration (DECO, previously LOC)
Hi! We are the DECO team; responsible for the appeal of the SHA2017 venue. We will be creating fantastic looking decoration pieces and awe-inspiring lighting. We are split up in two sub-teams with each two people as team-leads:
Sub-team Design
The design sub-team will handle the decoration of the terrain as well as the lighting.
Leads:
- polyfloyd (floyd@polyfloyd.net)
- Moem
Tasks:
- Analog decoration (signs, billboards)
- Lights (practical, nice-looking, hackable)
Immediate TODOs:
- Think of ideas to execute.
Ideas (add ideas you want to incorporate):
- The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights.
- A giant LEDCube.
- Reuse the OHM2013 LED poles.
Design ideas:
- Blocks/Cubes as a basis
- SHA is an important protocol for block chains
- the LEDCube idea is also a cube
- 3d print blocks that fit on shackles making literal blockclains
- Cube deco/lights are easy to make
Sub-team Fabrication
Leads:
- fk (mail@folkert-kevelam.nl)
- SA007
Tasks:
- Off-site (beforehand) fabrication of electronics and signing, etc.
- On-site (at the event) fabrication of spare-parts and repairs.
Cooperation with other Teams
What teams depend on Decoration?
- The Communications-Team needs us for static communication (via signs) with the visitors.
Who do we depend on?
- We need the Logistics and Buildup teams to move pre-built decoration pieces to the venue during the buildup.
- We need the Power-Team to power our lights.
- We need the NOC-Team to be able to control our interactive lights.
- We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain.
- We need the Volunteer-Team for volunteers to help create the decoration pieces.
Other
Floating members: Themba (Randomdata)
Next meeting: TBD Discuss:
- Budget
- Scope of the factory
- Ideas to execute