Difference between revisions of "Team:Decoratie"

From SHA2017
Jump to: navigation, search
Line 1: Line 1:
 
{{TeamInfo
 
{{TeamInfo
|Lead=User:SA007, User:polyfloyd
+
|Lead=User:SA007, User:polyfloyd, fk, Moem
 
|Does=* Street indication (follow the lights)
 
|Does=* Street indication (follow the lights)
 
* Street names / signs
 
* Street names / signs
Line 16: Line 16:
 
* Renting power-cables for everything
 
* Renting power-cables for everything
 
* Wireless anything
 
* Wireless anything
* Lighting/decoration support brought by individual visitors.
+
* Lighting/decoration support brought by individual visitors
 +
* Planning the partitioning of the terrain in areas and roads
 
|Contact=deco@sha2017.org
 
|Contact=deco@sha2017.org
 
|IRC=sha2017-deco
 
|IRC=sha2017-deco
Line 22: Line 23:
 
}}
 
}}
 
== Team Decoration (DECO, previously LOC) ==
 
== Team Decoration (DECO, previously LOC) ==
We are the DECO team; responsible for the appeal of the SHA2017 venue.
+
Hi! We are the DECO team; responsible for the appeal of the SHA2017 venue. We will be creating fantastic looking decoration pieces and awe-inspiring lighting.
 
We are split up in two sub-teams with each two people as team-leads:
 
We are split up in two sub-teams with each two people as team-leads:
  
  
 
== Sub-team Design ==
 
== Sub-team Design ==
 +
The design sub-team will handle the decoration of the terrain as well as the lighting.
 +
 
Leads:
 
Leads:
 
* polyfloyd (floyd@polyfloyd.net)
 
* polyfloyd (floyd@polyfloyd.net)
* (Your name here?)
+
* Moem
  
 
Tasks:
 
Tasks:
* Analog decoration
+
* Analog decoration (signs, billboards)
  * Signs
+
* Lights (practical, nice-looking, hackable)
* Lights
 
  * Practical
 
  * Nice-looking, hackable
 
  
 
Immediate TODOs:
 
Immediate TODOs:
* Think of ideas.
+
* Think of ideas to execute.
  
 
Ideas (add ideas you want to incorporate):
 
Ideas (add ideas you want to incorporate):
 
* The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights.
 
* The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights.
* giant LEDCube (4x4x4 meter)
+
* A giant LEDCube.
 +
* Reuse the OHM2013 LED poles.
  
  
Line 49: Line 50:
 
Leads:
 
Leads:
 
* fk (mail@folkert-kevelam.nl)
 
* fk (mail@folkert-kevelam.nl)
* SA007 (EMAIL)
+
* SA007
  
Tasks:  
+
Tasks:
 
* Off-site (beforehand) fabrication of electronics and signing, etc.
 
* Off-site (beforehand) fabrication of electronics and signing, etc.
 
* On-site (at the event) fabrication of spare-parts and repairs.
 
* On-site (at the event) fabrication of spare-parts and repairs.
 +
 +
 +
== Cooperation with other Teams ==
 +
What teams depend on Decoration?
 +
* The Communications-Team needs us for static communication (via signs) with the visitors.
 +
 +
Who do we depend on?
 +
* We need the Logistics and Buildup teams to move pre-built decoration pieces to the venue during the buildup.
 +
* We need the Power-Team to power our lights.
 +
* We need the Sysadmin-Team to be able to control our interactive lights.
 +
* We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain.
 +
* We need the Volunteer-Team for volunteers to help create the decoration pieces.
  
  
 
== Other ==
 
== Other ==
 +
Floating members: Themba (Randomdata)
  
Floating members: Themba (Randomdata)
+
Next meeting: TBD

Revision as of 21:51, 27 January 2016

Decoratie
1st line contacts: SA007, polyfloyd, [[fk|]], [[Moem|]]
Does:
  • Street indication (follow the lights)
  • Street names / signs
  • Main gate (+lights)
  • Large-ish decor pieces throughout the terrain
  • Art-net infra + operation center
  • Renting/buying data cables and equipment for our team
  • Provide the tools and materials in the On-site Factory
  • Build the analog decoration at Fabrication (preferably before the event starts)
  • Decorates the tents (NOT the stages)
Does not:
  • Literal streetlights
  • The stage
  • The Lounge
  • The physical infrastructure of our network (that's the responsibility of Team Infra)
  • Renting power-cables for everything
  • Wireless anything
  • Lighting/decoration support brought by individual visitors
  • Planning the partitioning of the terrain in areas and roads
Is an exclusive team:
Contact: deco@sha2017.org
IRC: #sha2017-deco
Deadlines:
Needed resources:
Comment:
Vacancies: 0
Current team size / amount of ppl: 0
Contact at projectleiding:
Backup Contact at projectleiding: {{{Backup_Projectleiding}}}
"{{{Backup_Projectleiding}}}" cannot be used as a page name in this wiki.
Managed Vacancies:
You can add for your team on a page by adding: {{TeamVacancies|Decoratie}}

11 Team Members Decoratie

Team Decoration (DECO, previously LOC)

Hi! We are the DECO team; responsible for the appeal of the SHA2017 venue. We will be creating fantastic looking decoration pieces and awe-inspiring lighting. We are split up in two sub-teams with each two people as team-leads:


Sub-team Design

The design sub-team will handle the decoration of the terrain as well as the lighting.

Leads:

  • polyfloyd (floyd@polyfloyd.net)
  • Moem

Tasks:

  • Analog decoration (signs, billboards)
  • Lights (practical, nice-looking, hackable)

Immediate TODOs:

  • Think of ideas to execute.

Ideas (add ideas you want to incorporate):

  • The Loon, a wacky-inflatable-arm-flailing-tube-man like balloon that is inflated by a fan at the base along with some lights.
  • A giant LEDCube.
  • Reuse the OHM2013 LED poles.


Sub-team Fabrication

Leads:

  • fk (mail@folkert-kevelam.nl)
  • SA007

Tasks:

  • Off-site (beforehand) fabrication of electronics and signing, etc.
  • On-site (at the event) fabrication of spare-parts and repairs.


Cooperation with other Teams

What teams depend on Decoration?

  • The Communications-Team needs us for static communication (via signs) with the visitors.

Who do we depend on?

  • We need the Logistics and Buildup teams to move pre-built decoration pieces to the venue during the buildup.
  • We need the Power-Team to power our lights.
  • We need the Sysadmin-Team to be able to control our interactive lights.
  • We need the partitioning plan for the terrain from (what team has this responsibility???) to estimate how much and what we need design for the terrain.
  • We need the Volunteer-Team for volunteers to help create the decoration pieces.


Other

Floating members: Themba (Randomdata)

Next meeting: TBD