Difference between revisions of "TalkProgressIndicator"

From SHA2017
Jump to: navigation, search
 
Line 1: Line 1:
 
{{DecoProject
 
{{DecoProject
 
|Image=File:Gameoflife.png
 
|Image=File:Gameoflife.png
|Status=idea
+
|Status=abandoned
 
}}
 
}}
 
Put LED-strips above the entrances of track-tents to indicate the progress of the current talk, the time until the next talk starts and perhaps some idle animation when the days schedule has ended.
 
Put LED-strips above the entrances of track-tents to indicate the progress of the current talk, the time until the next talk starts and perhaps some idle animation when the days schedule has ended.

Latest revision as of 18:22, 27 May 2017

TalkProgressIndicator
Gameoflife.png
Person Responsible
Status abandoned
Budget Required
Budget Granted None (yet)
buildup from
buildup duration
buildup orga
buildup angels
teardown from
teardown duration
teardown orga
teardown angels
waste
comments

Put LED-strips above the entrances of track-tents to indicate the progress of the current talk, the time until the next talk starts and perhaps some idle animation when the days schedule has ended.

Dependencies

  • TODO: Other teams needed?
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

  • TODO: Buildlog...

Howto: Buildup

  • TODO: Where to get the stuff from?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?