Difference between revisions of "TLShruggie"
From SHA2017
Line 6: | Line 6: | ||
|BudgetGranted=100 | |BudgetGranted=100 | ||
|buildup from=08-01 | |buildup from=08-01 | ||
− | |buildup duration= | + | |buildup duration=3 hours |
|buildup orga=1 | |buildup orga=1 | ||
|buildup angels=2 | |buildup angels=2 |
Revision as of 15:00, 23 July 2017
TLShruggie | |
---|---|
Person Responsible | User:SA007 |
Status | work started |
Budget Required | 100 |
Budget Granted | 100 |
buildup from | 08-01 |
buildup duration | 3 hours |
buildup orga | 1 |
buildup angels | 2 |
teardown from | 08-08 |
teardown duration | 1 |
teardown orga | 0 |
teardown angels | 2 |
waste | 0 |
comments | - |
A large shrug lenny face made out of TL lights.
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
Spul nodig:
- 3x bouwhekken https://www.boels.nl/en/rental/site-preparation/event-fencing/events-fencing-open
- 3x bouwhek-opzetstukken https://www.boels.nl/en/rental/site-preparation/event-fencing/temporary-fence
- 6x bracing bars https://www.boels.nl/en/rental/site-preparation/fencing-accessories/braces
- 9x clamp https://www.boels.nl/en/rental/site-preparation/fencing-accessories/clamps
Howto: Buildup
- Still requires cables to be connected. Need about 2 angels and 2 hours with the right materials.
- Volunteers required for set up: 2
- Time required: 1 hour
- Where to get the stuff from? Hack42
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- Ship back to Hack42
- Volunteers: 2 people half an hour
- Trash volume: 0