Difference between revisions of "Lecterns"
From SHA2017
(One intermediate revision by one other user not shown) | |||
Line 5: | Line 5: | ||
|BudgetRequired=300 | |BudgetRequired=300 | ||
|BudgetGranted=300 | |BudgetGranted=300 | ||
+ | |buildup from=08-01 | ||
+ | |buildup duration=1 hours | ||
+ | |buildup orga=0 | ||
+ | |buildup angels=1 | ||
+ | |teardown from=08-08, 18:00 | ||
+ | |teardown duration=1 hours | ||
+ | |teardown orga=0 | ||
+ | |teardown angels=1 | ||
+ | |waste=Niets. Deze worden weggegeven/bruikleen | ||
+ | |comments=Moeten alleen op de stages worden gebracht/geplaatst | ||
}} | }} | ||
Team Productiehuis asked us to create three lecterns for the tracks. | Team Productiehuis asked us to create three lecterns for the tracks. |
Latest revision as of 16:06, 23 July 2017
Lecterns | |
---|---|
Person Responsible | User:Moem |
Status | work started |
Budget Required | 300 |
Budget Granted | 300 |
buildup from | 08-01 |
buildup duration | 1 hours |
buildup orga | 0 |
buildup angels | 1 |
teardown from | 08-08, 18:00 |
teardown duration | 1 hours |
teardown orga | 0 |
teardown angels | 1 |
waste | Niets. Deze worden weggegeven/bruikleen |
comments | Moeten alleen op de stages worden gebracht/geplaatst |
Team Productiehuis asked us to create three lecterns for the tracks.
Requirements:
- A conduit for 230V, audio and video cables (to connect laptops) discretely worked in the desk
- A shelf for a DI-unit also connected to the conduit
- Allow to speaker to place a drink on top/a tray
- If the top surface is sloped, there should be a rim at the front to prevent a laptop from sliding down
- The height of the platform should be 120cm.
- Have the SHA colors incorporated in the design
[13:03:14] <Moem> Hey ho Deco. I have talked to Peter and he can build us three awesome lecterns for 75 a piece, with a frosted glass front that can be lit from the inside. How does that sound?
Dependencies
- TODO: Other teams needed?
- TODO: Network? Private network required?
Status
- TODO: Buildlog...
Howto: Buildup
- TODO: Where to get the stuff from?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?