FireMatrix
From SHA2017
Revision as of 13:58, 5 July 2017 by Bitlair.nl-polyfloyd (talk | contribs)
FireMatrix | |
---|---|
Person Responsible | User:SA007 |
Status | work started |
Budget Required | 300 |
Budget Granted | 300 |
buildup from | |
buildup duration | |
buildup orga | |
buildup angels | |
teardown from | |
teardown duration | |
teardown orga | |
teardown angels | |
waste | |
comments |
Private project of SA007 and hobbybob. Budget of 500 E is for gas and some more for extra flamethrowers.
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
- 3x Wheelie bin from team waste reserved (Contact on field: Sebastius)
Fences needed: 12x https://www.boels.nl/en/rental/site-preparation/event-fencing/crowd-control-barrier-19-post
Due to time constraints, the project will be scaled down to a 4x4 matrix.
Howto: Buildup
- TODO: Where to get the stuff from?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?