{{DecoProject | {{DecoProject | ||
− | |Image=File: | + | |Image=File:Photo 2017-06-11 17-03-51.jpg |
− | |Lead=User: | + | |Lead=User:Moem |
− | | | + | |Status=work started |
− | | | + | |BudgetRequired=1000 |
+ | |BudgetGranted=1000 | ||
+ | |buildup from=08-01 | ||
+ | |buildup duration=5 hours | ||
+ | |buildup orga=1 | ||
+ | |buildup angels=4 | ||
+ | |teardown from=08-08, 18:00 | ||
+ | |teardown duration=3 hours | ||
+ | |teardown orga=1 | ||
+ | |teardown angels=4 | ||
+ | |waste=1000 liter | ||
+ | |comments=Hoogwerker needed | ||
}} | }} | ||
The gate to the SHA2017 world. | The gate to the SHA2017 world. | ||
* Entrance gate: | * Entrance gate: | ||
− | ** | + | **The gate will be made from scaffolding and the front will be covered in wooden boards, sawed into shape and painted. |
− | + | **There will also be a shruggie lined with 'lichtslang'. | |
− | + | **The gate will be decorated with flags and can certainly use some spotlights. | |
− | ** | ||
− | |||
− | |||
− | ** | ||
− | |||
− | |||
== Dependencies == | == Dependencies == | ||
* TODO: Other teams needed? | * TODO: Other teams needed? | ||
− | * | + | * Permit is taken care of. |
* TODO: Power in watts? | * TODO: Power in watts? | ||
− | * | + | * The gate needs no network. |
== Status == | == Status == | ||
− | * | + | * Moem made a sketch and a building plan. |
+ | * Stitch is talking to the people who rent out the scaffolding. He has drawings too. | ||
+ | * Wood has been bought. | ||
+ | * Gate has been designed and cut out of wood. | ||
+ | * Painting is ongoing. | ||
+ | * Scaffolding has been ordered. | ||
== Howto: Buildup == | == Howto: Buildup == | ||
Line 37: | Line 47: | ||
* TODO: How many volunteers are required? | * TODO: How many volunteers are required? | ||
* TODO: How much time is required? | * TODO: How much time is required? | ||
+ | |||
+ | * Trash volume: 1000 liter |
Latest revision as of 16:07, 23 July 2017
EntranceGate | |
---|---|
Person Responsible | User:Moem |
Status | work started |
Budget Required | 1000 |
Budget Granted | 1000 |
buildup from | 08-01 |
buildup duration | 5 hours |
buildup orga | 1 |
buildup angels | 4 |
teardown from | 08-08, 18:00 |
teardown duration | 3 hours |
teardown orga | 1 |
teardown angels | 4 |
waste | 1000 liter |
comments | Hoogwerker needed |
The gate to the SHA2017 world.
- Entrance gate:
- The gate will be made from scaffolding and the front will be covered in wooden boards, sawed into shape and painted.
- There will also be a shruggie lined with 'lichtslang'.
- The gate will be decorated with flags and can certainly use some spotlights.
Dependencies
- TODO: Other teams needed?
- Permit is taken care of.
- TODO: Power in watts?
- The gate needs no network.
Status
- Moem made a sketch and a building plan.
- Stitch is talking to the people who rent out the scaffolding. He has drawings too.
- Wood has been bought.
- Gate has been designed and cut out of wood.
- Painting is ongoing.
- Scaffolding has been ordered.
Howto: Buildup
- TODO: Where to get the stuff from?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- Trash volume: 1000 liter