Difference between revisions of "EntranceGate"
From SHA2017
m (→Status) |
|||
Line 6: | Line 6: | ||
|BudgetGranted=1000 | |BudgetGranted=1000 | ||
|buildup from=08-01 | |buildup from=08-01 | ||
− | |buildup duration=5 | + | |buildup duration=5 hours |
|buildup orga=1 | |buildup orga=1 | ||
|buildup angels=4 | |buildup angels=4 | ||
− | |teardown from=08-08 | + | |teardown from=08-08, 18:00 |
− | |teardown duration=3 | + | |teardown duration=3 hours |
|teardown orga=1 | |teardown orga=1 | ||
|teardown angels=4 | |teardown angels=4 |
Latest revision as of 16:07, 23 July 2017
EntranceGate | |
---|---|
Person Responsible | User:Moem |
Status | work started |
Budget Required | 1000 |
Budget Granted | 1000 |
buildup from | 08-01 |
buildup duration | 5 hours |
buildup orga | 1 |
buildup angels | 4 |
teardown from | 08-08, 18:00 |
teardown duration | 3 hours |
teardown orga | 1 |
teardown angels | 4 |
waste | 1000 liter |
comments | Hoogwerker needed |
The gate to the SHA2017 world.
- Entrance gate:
- The gate will be made from scaffolding and the front will be covered in wooden boards, sawed into shape and painted.
- There will also be a shruggie lined with 'lichtslang'.
- The gate will be decorated with flags and can certainly use some spotlights.
Dependencies
- TODO: Other teams needed?
- Permit is taken care of.
- TODO: Power in watts?
- The gate needs no network.
Status
- Moem made a sketch and a building plan.
- Stitch is talking to the people who rent out the scaffolding. He has drawings too.
- Wood has been bought.
- Gate has been designed and cut out of wood.
- Painting is ongoing.
- Scaffolding has been ordered.
Howto: Buildup
- TODO: Where to get the stuff from?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- Trash volume: 1000 liter