Difference between revisions of "EntranceGate"
From SHA2017
m (some info) |
m (→Status) |
||
Line 22: | Line 22: | ||
* Moem made a sketch and a building plan. | * Moem made a sketch and a building plan. | ||
* Stitch is talking to the people who rent out the scaffolding. He has drawings too. | * Stitch is talking to the people who rent out the scaffolding. He has drawings too. | ||
+ | * Wood has been bought. | ||
== Howto: Buildup == | == Howto: Buildup == |
Revision as of 09:39, 18 June 2017
EntranceGate | |
---|---|
Person Responsible | User:Moem |
Status | work started |
Budget Required | 1000 |
Budget Granted | 1000 |
buildup from | |
buildup duration | |
buildup orga | |
buildup angels | |
teardown from | |
teardown duration | |
teardown orga | |
teardown angels | |
waste | |
comments |
The gate to the SHA2017 world.
- Entrance gate:
- The gate will be made from scaffolding and the front will be covered in wooden boards, sawed into shape and painted.
- There will also be a shruggie lined with 'lichtslang'.
- The gate will be decorated with flags and can certainly use some spotlights.
Dependencies
- TODO: Other teams needed?
- Permit is taken care of.
- TODO: Power in watts?
- The gate needs no network.
Status
- Moem made a sketch and a building plan.
- Stitch is talking to the people who rent out the scaffolding. He has drawings too.
- Wood has been bought.
Howto: Buildup
- TODO: Where to get the stuff from?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- Trash volume: 1000 liter