Team:Power

From SHA2017
Revision as of 21:52, 16 January 2017 by Damnlie (talk | contribs)

Jump to: navigation, search
Power
1st line contacts: timo
Does: Provide power to all of the event
Does not:
Is an exclusive team: Yes
Contact: power@lists.sha2017.org
IRC: #sha2017-power
Deadlines:
Needed resources:
Comment:
Vacancies: 8
Current team size / amount of ppl: 0
Contact at projectleiding: User:Attilla
Backup Contact at projectleiding: User:Rolfvandekrol
Managed Vacancies:
You can add for your team on a page by adding: {{TeamVacancies|Power}}

6 Team Members Power

About

Providing power to the event

Members

ToDo

Requirements from other teams

  • team:Logistics/Waste: two times 3phase power from event-1 until the end of teardown for trashcompactors (one behind foodcourt, other near logistics, but location and exact requirements are tbd).

Fixed Infrastructure

There is a fixed Infrastructure on entire camp ground with an 80 Amp feed from the Power Company


Maincable.jpg Fixed Power cable routing

  • From the Power station building running power cable to fields (Telephony and fieber too).


Fieldbox.jpg Typically Fiele boxes

  • The entire Field Grid kan be switched to a Portable Generator Port (2 single Wire Inputs)

Powerinput.jpg

  • Main switch Panel

Mainswitch1.jpg

Mainswitch2.jpg

Mainswitch3.jpg