Difference between revisions of "Team:Power"

From SHA2017
Jump to: navigation, search
(Fixed Infrastructure)
(Fixed Infrastructure)
Line 12: Line 12:
 
There is a fixed Infrastructure on entire camp ground with an 80 Amp feed from the Power Company
 
There is a fixed Infrastructure on entire camp ground with an 80 Amp feed from the Power Company
  
* Fixed Power cable routing
 
[[File:Maincable.jpg|200px|left|thumb]]
 
From the Power station building running power cable to fields (Telephony and fieber too).
 
  
* Typically Fiele boxes
+
[[File:Maincable.jpg|left|frameless|border|link=]] Fixed Power cable routing
[[File:Fieldbox.jpg|200px|left|thumb]]
+
* From the Power station building running power cable to fields (Telephony and fieber too).
 +
 
 +
 
 +
[[File:Fieldbox.jpg|left|frameless|border|link=]] Typically Fiele boxes
  
 
* The entire Field Grid kan be switched to a Portable Generator Port (2 single Wire Inputs)
 
* The entire Field Grid kan be switched to a Portable Generator Port (2 single Wire Inputs)
[[File:Powerinput.jpg|200px|left|thumb]]
+
[[File:Powerinput.jpg|left|frameless|border|link=]]
  
 
* Main switch Panel
 
* Main switch Panel
[[File:Mainswitch1.jpg|200px|left|thumb]]
+
[[File:Mainswitch1.jpg|left|frameless|border|link=]]
  
[[File:Mainswitch2.jpg|200px|left|thumb]]
+
[[File:Mainswitch2.jpg|left|frameless|border|link=]]
  
[[File:Mainswitch3.jpg|200px|left|thumb]]
+
[[File:Mainswitch3.jpg|left|frameless|border|link=]]
  
 
==Members==
 
==Members==

Revision as of 15:08, 27 August 2016

Power
1st line contacts: timo
Does: Provide power to all of the event
Does not:
Is an exclusive team: Yes
Contact:
IRC: #
Deadlines:
Needed resources:
Comment:
Vacancies: 8
Current team size / amount of ppl: 0
Contact at projectleiding: User:Attilla
Backup Contact at projectleiding: {{{Backup_Projectleiding}}}
"{{{Backup_Projectleiding}}}" cannot be used as a page name in this wiki.
Managed Vacancies:
You can add for your team on a page by adding: {{TeamVacancies|Power}}

6 Team Members Power

About

Providing power to the event

Fixed Infrastructure

There is a fixed Infrastructure on entire camp ground with an 80 Amp feed from the Power Company


Maincable.jpg
Fixed Power cable routing
  • From the Power station building running power cable to fields (Telephony and fieber too).


Fieldbox.jpg
Typically Fiele boxes
  • The entire Field Grid kan be switched to a Portable Generator Port (2 single Wire Inputs)
Powerinput.jpg
  • Main switch Panel
Mainswitch1.jpg
Mainswitch2.jpg
Mainswitch3.jpg

Members

  • RFguy
  • ultratux
  • benadski
  • see Team:Infrastucture?!