Difference between revisions of "TLShruggie"

From SHA2017
Jump to: navigation, search
 
Line 8: Line 8:
 
|buildup duration=3 hours
 
|buildup duration=3 hours
 
|buildup orga=1
 
|buildup orga=1
|buildup angels=2
+
|buildup angels=2 hours
|teardown from=08-08
+
|teardown from=08-08, 18:00
|teardown duration=1
+
|teardown duration=1 hours
 
|teardown orga=0
 
|teardown orga=0
 
|teardown angels=2
 
|teardown angels=2

Latest revision as of 16:10, 23 July 2017

TLShruggie
C 0qRZLXkAADETi.jpg
Person Responsible User:SA007
Status work started
Budget Required 100
Budget Granted 100
buildup from 08-01
buildup duration 3 hours
buildup orga 1
buildup angels 2 hours
teardown from 08-08, 18:00
teardown duration 1 hours
teardown orga 0
teardown angels 2
waste 0
comments -

A large shrug lenny face made out of TL lights.

Dependencies

  • TODO: Other teams needed?
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

Spul nodig:

Howto: Buildup

  • Still requires cables to be connected. Need about 2 angels and 2 hours with the right materials.
  • Volunteers required for set up: 2
  • Time required: 1 hour
  • Where to get the stuff from? Hack42
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • Ship back to Hack42
  • Volunteers: 2 people half an hour
  • Trash volume: 0