Difference between revisions of "SHAllywood"

From SHA2017
Jump to: navigation, search
m (Status)
m (Dependencies)
Line 12: Line 12:
 
== Dependencies ==
 
== Dependencies ==
 
* TODO: Other teams needed?
 
* TODO: Other teams needed?
 +
** Needs transport by Logistics.
 
* TODO: Permits required?
 
* TODO: Permits required?
 
* TODO: Power in watts?
 
* TODO: Power in watts?

Revision as of 19:46, 17 July 2017

SHAllywood
Shaletters.JPG
Person Responsible User:SA007
Status work started
Budget Required 200
Budget Granted 200
buildup from
buildup duration
buildup orga
buildup angels
teardown from
teardown duration
teardown orga
teardown angels
waste
comments

Create Hollywood-ish letters to put somewhere on the terrain.

3 boards with size 2.44x1.22 would be plenty big. But seven is even better!

Dependencies

  • TODO: Other teams needed?
    • Needs transport by Logistics.
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

  • Letters have been designed, cut from wood, and painted white.
  • Letters have been painted in SHAcolours.
  • (Almost all) LEDS have been attached to letters.
  • Letters are stored at #42.

Howto: Buildup

  • TODO: Where to get the stuff from?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • Trash volume: ±1000 liter (380 for 7 plates, 120 for beams + extra)