Projects:Badge/Sweatshop

From SHA2017
< Projects:Badge
Revision as of 00:56, 25 July 2017 by Anus (talk | contribs) (The Sweatshop list v4)

Jump to: navigation, search
Projects:Badge/Sweatshop
Name Badge Sweatshop
StartDate 2017/07/26 17:00:00 AM
The date "2017/07/26 17:00:00 AM" was not understood.
EndDate 2017/07/26 23:59:00 PM
The date "2017/07/26 23:59:00 PM" was not understood.
Where RevSpace, Overgoo 1, 2266 JZ Leidschendam

Sweatshop 3

We have 1k and possibly 2k boards in house. We would like to do a sweatshop and assemble the badges, give them software and put them in a kit.

July 26, approximately 17:30/1800 starting time depending on amount of people and arrival time of boards.

Name Comments
Sebastius Will arrive early to set up
Kartoffel Brings the wheels
Gori
Carola
F0X
JnX Hopefully before 19:00
Lukkie
Blaat
NickFarr
You? Comment?

Sweatshop 2

We have 1k and possibly 2.5k boards in house. We would like to do a sweatshop and assemble the badges, give them software and put them in a kit.

Planning

This sweatshop will take place on the 22nd of July.

We start at 12.00, doors will be open from 11.00. If you're a late arrival we can still use you as a relief for a tired hacker. Please sign up!

We estimate assembling a badge will take approximately 2 minutes (might get faster). It should be about 3 to 4 hours of work.


The Sweatshop list

We need your help, please sign up on the list below. We will provide snacks and drinks. No wiki account? Email to badge at sebasti.us

July 22

Name Comments
Sebastius Will arrive early to set up
Anus Carying the gold-master firmware
Kartoffel ¯\_(ツ)_/¯
raboof Departure from Station Deventer 9:30, room for 2 more carpoolers. Will have to leave 16:00ish.
Tatiana
Lukkie Burning the firmwarez!
blaat
IPMuts -
hp197 From UTR, can take people with me
Jelle -
#FFAA5E Travelling with raboof from Deventer station
bernardomr ¯\_(シ)_/¯
You? Comment?

The Sweatshop list v4

We need your help, please sign up on the list below. We will provide snacks and drinks. No wiki account? Email to badge at sebasti.us

July 29

Name Comments
Anus Will arrive early (friday) to set up
Ranzbak Will come with magnifier and other tools
DiffZ Wise person from the east
a hacker From that there TechInc (horefully) bringing nice soldering iron
another hacker From that there TechInc (horefully) bringing stereo microscope

Ergonomy/planning for sweatshop 2 and 3

These plans are preliminary and will be finalized before badge-day.

Stations:

  • Unpacking boards and Connecting display
  • Flashing FW (2 ppl)
  • Applying gluedots (3 ppl)
  • Packing boards and inserting into kits
  • Supplying boards/displays, kits and moving filled SAMLA crates

Desks are too low to do work standing up for most stations.

Ergonomy for sweatshop 1

A test run was done on 8 July, to ergonomically optimize the workflow.

Findings:

  • Table height is too low. A 45 liter samla turned upside down provides the right amount of elevation, shorter and taller people can still use it.
  • The narrow gutter between the samlas and the side of the table, can be used for buffers
  • Even the smallest samla box is too big for the LEDs and the motor; small 1-person lasagne dishes work well
  • The smallest samla is perfect for keeping filled bags upright
  • We have determined which scoop is the best for gathering components and bought a few of those
  • Two people per gathering station works best:
    • Left operator does the larger items:
      • Grab ziplock bag with left hand
      • Grab spam and flyer with right hand, put into bag held in left hand
      • Grab lanyard with right hand, use both hands to compress, put into bag
      • Leave bag on the table (buffer)
    • Right operator does the smaller items:
      • Hold scoop in right hand
      • Pick up from right to left, using left hand: hook piece, loop piece, LEDs, motor, battery
      • Put right thumb on battery to keep everything in the scoop
      • Grab bag from the table (prepared by left operator) with left hand
      • While dropping contents from scoop with the right hand, put bag upright into small samla
      • Don't close the bag!
    • Reverse right and left on the opposite side of the table in case both are left-handed
  • You need a dedicated runner to take care of:
    • Replenishing stock
    • Pre-opening ziplock bags if time permits (this makes the "left operator"'s job much easier!)
    • Moving finished bags from small samlas to cardboard boxes

Each kit takes 24 seconds to complete, so if we calculate 30 seconds per kit per person, at 4000 kits we need 120.000 manseconds = 33 manhours of labour. Assuming 12 people working and two tending supplies and moving stuff the job will be done in approximately 3 hours.