Difference between revisions of "Heaven"
From SHA2017
Line 9: | Line 9: | ||
|buildup orga=1 | |buildup orga=1 | ||
|buildup angels=3 | |buildup angels=3 | ||
− | |teardown from=08- | + | |teardown from=08-08, 18:00 |
− | |teardown duration=1 | + | |teardown duration=1 hours |
|teardown orga=0 | |teardown orga=0 | ||
|teardown angels=2 | |teardown angels=2 |
Latest revision as of 16:08, 23 July 2017
Heaven | |
---|---|
Person Responsible | User:Polyfloyd |
Status | work started |
Budget Required | 0 |
Budget Granted | 0 |
buildup from | 08-01 |
buildup duration | 4 hours |
buildup orga | 1 |
buildup angels | 3 |
teardown from | 08-08, 18:00 |
teardown duration | 1 hours |
teardown orga | 0 |
teardown angels | 2 |
waste | 30 liter |
comments | Buildup includes manufacturing |
Sling has asked us to decorate the volunteer lounge (Heaven) with some pretty lights.
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
We will be using parts of other projects to decorate the heaven:
- Colored TL Lights: 4x
- Spotlights: 2x
Howto: Buildup
- Clouds
- Use the wooden sheets left over from the signs, these are spread over Bitlair and Hack42
- Apply the ground layer of paint (and let dry)
- Apply 6 strokes of paint in the same fashion as the signs with rollers
- Cut wooden sheets with a decoupeerzaag
- Hang them from the ceiling in the heaven with some string
- Other stuff: See Status
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?