|BudgetRequired=1000
 
|BudgetRequired=1000
 
|BudgetGranted=1000
 
|BudgetGranted=1000
 +
|buildup from=08-01
 +
|buildup duration=5 hours
 +
|buildup orga=1
 +
|buildup angels=4
 +
|teardown from=08-08, 18:00
 +
|teardown duration=3 hours
 +
|teardown orga=1
 +
|teardown angels=4
 +
|waste=1000 liter
 +
|comments=Hoogwerker needed
 
}}
 
}}
 
The gate to the SHA2017 world.
 
The gate to the SHA2017 world.
Line 23: Line 33:
 
* Stitch is talking to the people who rent out the scaffolding. He has drawings too.
 
* Stitch is talking to the people who rent out the scaffolding. He has drawings too.
 
* Wood has been bought.
 
* Wood has been bought.
 +
* Gate has been designed and cut out of wood.
 +
* Painting is ongoing.
 +
* Scaffolding has been ordered.
  
 
== Howto: Buildup ==
 
== Howto: Buildup ==

Latest revision as of 16:07, 23 July 2017

EntranceGate
Photo 2017-06-11 17-03-51.jpg
Person Responsible User:Moem
Status work started
Budget Required 1000
Budget Granted 1000
buildup from 08-01
buildup duration 5 hours
buildup orga 1
buildup angels 4
teardown from 08-08, 18:00
teardown duration 3 hours
teardown orga 1
teardown angels 4
waste 1000 liter
comments Hoogwerker needed

The gate to the SHA2017 world.

  • Entrance gate:
    • The gate will be made from scaffolding and the front will be covered in wooden boards, sawed into shape and painted.
    • There will also be a shruggie lined with 'lichtslang'.
    • The gate will be decorated with flags and can certainly use some spotlights.

Dependencies

  • TODO: Other teams needed?
  • Permit is taken care of.
  • TODO: Power in watts?
  • The gate needs no network.

Status

  • Moem made a sketch and a building plan.
  • Stitch is talking to the people who rent out the scaffolding. He has drawings too.
  • Wood has been bought.
  • Gate has been designed and cut out of wood.
  • Painting is ongoing.
  • Scaffolding has been ordered.

Howto: Buildup

  • TODO: Where to get the stuff from?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • Trash volume: 1000 liter