Roadmap

From SHA2017
Revision as of 16:26, 8 January 2017 by Stitch (talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Roadmap

  • YYYY MM
  • 2015 12 Have a location
    • Location was found. We've got an exception on the "bestemmingsplan". Then the contract is signed and sent in December 2016.
  • 2016 12 30 Open ticketshop (last day CCC congress)
  • 2017 04 Apply for Permit
    • Permit is in the works.